Killi gets busy

Killi is a newcomer to the iron ore space having only acquired its Lodestone magnetite project in WA’s Mid-West in June.

It came with a 110Mt inferred resource and it will be no surprise if the resource quadruples in the next 12 months as the company gets busy with the drill bit.

Lodestone is a magnetite project with a difference.

It is of the rare coarse-grained recrystallised-type suitable for the low-cost production of a premium 68-70% iron concentrate for making direct reduction pellets used in electric arc furnaces, a greener and fast-growing method of steel production.

Former Fortescue boss Nev Power is the chairman. Power also had a long stint at Smorgon Steel which specialised in EAF steel production, albeit using scrap metal.

So he knows his stuff when it comes to magnetite and EAF steel and obviously rates Lodestone.

East Coast Research recently set a 60c price target on the stock in a commissioned report.

Arrow points back to iron ore

Arrow is a junior that has an iron ore project next door to Simandou and a bauxite project, also in Guinea. Either of them might or might not come in. If either of them does, it will be off to the races for Arrow.

The company is led by David Flanagan of Atlas Iron fame.

Between 2004 and 2016 Flanagan and crew grew Atlas from a $9 million company to as much as $4.5 billion by growing a 15mtpa Pilbara iron ore production base that relied on trucking to get the iron ore to port.

When iron ore prices plunged to below US$40/t in 2015, Atlas had its problems and the company was eventually sold off to Gina Rinehart for $390 million.

Flanagan is back in the Pilbara with Arrow at the Yarraloola iron ore project in the back yard of Rio Tinto’s Robe River operations. The new open-access Mardie port is all of 50km away meaning any future Arrow operation would have a much easier route to market than was the case for Atlas.